Selected Work

Ameriya Cold-Storage Infrastructure

Client

Industrial Logistics & Cold Storage Complex

Consultant

Armed Forces Engineering Authority Consulting Directorate

Capacity

Industrial Cooling & Water Distribution Loops

Scope

Process Cooling Loops · Water Distribution Network · Pressure Balancing · Commissioning

Delivered

2021

Location

Ameriya, Alexandria

Disciplines

Industrial & Electromechanical · Pumping & Deep Wells

Ameriya Cold-Storage Infrastructure

Project Context & Requirements

A cold-storage complex required process cooling and a distribution network able to hold temperature under continuous load.

Process Schematic & Flow

The actual engineered treatment and transfer sequence implemented in this facility.

Process Flow & Technical Schematic
5 Process Phases
Step 01

Chiller Plant

Refrigeration generation

Step 02

Heat Exchangers

Thermal transfer

Step 03

Primary Loop

Circulation pumping

Step 04

Distribution Network

Insulated pipework

Step 05Final

Evaporator Coils

Cold room cooling

Engineered Process Sequence — Single-Contract DeliveryVerified Schematic
Ameriya Cold-Storage Infrastructure
Ameriya Cold-Storage Infrastructure
Ameriya Cold-Storage Infrastructure
Ameriya Cold-Storage Infrastructure
Ameriya Cold-Storage Infrastructure

Delivered Outcome

Process cooling loops, distribution network and electromechanical works commissioned and handed over.

Our Execution Standard

One partner · Full scope · Delivered as agreed.

Build with one accountable partner.

Direct access to our senior engineering leads. We review project tenders, perform feasibility assessments, and structure turnkey proposals.

Submit Technical Enquiry