Awlad El-Sheikh Potable Water Pumping Station

Client

Potable Water & Sanitation Authority (NOPWASD)

Consultant

Third Field Army Engineering Department

Capacity

Potable Water Lifting Hub

Scope

Civil Well Construction · Submersible & Booster Pump Sets · Control Panels · Testing

Delivered

2022

Location

Sohag

Disciplines

Pumping & Deep Wells

Awlad El-Sheikh Potable Water Pumping Station

Project Context & Requirements

A village supply network in Sohag required a pumping station sized for peak demand with redundancy for continuous service.

Scope & Deliverables

01Pumping station commissioned with standby redundancy.

Process Schematic

The treatment and transfer sequence applied on this facility, drawn at concept level.

BOOSTER PUMPING MANIFOLDSUCTIONWet wellDUTY 01DUTY 02STANDBYSURGE VESSELAnti-hammerRISING MAINTo networkVFD CONTROL PANEL · FLOW · PRESSURE · LEVELDUTY POINT SET FROM MEASURED SYSTEM CURVE · WITNESSED PERFORMANCE TEST
Conceptual engineering schematic — illustrative, not a construction document
Awlad El-Sheikh Potable Water Pumping Station
Awlad El-Sheikh Potable Water Pumping Station

Delivered Outcome

Station built, electromechanically equipped and commissioned with standby capacity and remote monitoring.

Our Execution Standard

One partner · Full scope · Delivered as agreed.

Build with one accountable partner.

Direct access to our senior engineering leads. We review project tenders, perform feasibility assessments, and structure turnkey proposals.

Submit Technical Enquiry