Selected Work

Toshka Multi-Station Pumping System (22 Hubs)

Client

National Service Projects Organization (NSPO)

Consultant

Al-Amar Group

Capacity

22 Irrigation & Water Pumping Stations

Scope

Turnkey Mechanical & Electrical Pumping · Basket Screens · Automation · Long-Term O&M

Delivered

2022

Location

Toshka, Aswan

Disciplines

Wastewater Treatment · Infrastructure Networks & Pipelines

Toshka Multi-Station Pumping System (22 Hubs)

Project Context & Requirements

Critical desert lifting, pumping, and distribution infrastructure to support strategic agricultural reclamation in Toshka under harsh ambient temperatures and high hydraulic heads.

Process Schematic & Flow

The actual engineered treatment and transfer sequence implemented in this facility.

Process Flow & Technical Schematic
6 Process Phases
Step 01

Wet Well Intake

Source water collection

Step 02

Screening

Coarse and fine basket screens

Step 03

Heavy Duty Pumping

Lifting via high-head sets

Step 04

VFD & Control

Automated discharge regulation

Step 05

Surge Protection

Anti-hammer vessels

Step 06Final

Distribution

Reclamation supply lines

Engineered Process Sequence — Single-Contract DeliveryVerified Schematic
Toshka Multi-Station Pumping System (22 Hubs)
Toshka Multi-Station Pumping System (22 Hubs)
Toshka Multi-Station Pumping System (22 Hubs)

Delivered Outcome

Completed mechanical, electrical, and hydraulic stations with heavy-duty pump sets, basket screens, and automated discharge controls handed over for long-term operation.

Our Execution Standard

One partner · Full scope · Delivered as agreed.

Build with one accountable partner.

Direct access to our senior engineering leads. We review project tenders, perform feasibility assessments, and structure turnkey proposals.

Submit Technical Enquiry